Cap the number of parallel tests to 4 to not overwhelm beefier hosts. I tried this with 8 jobs, but it often caused annoying timeouts in nspawn-based tests; maybe this could be investigated and potentially addressed in the future. [skip changelog] |
||
|---|---|---|
| .. | ||
| run-integration-tests.sh | ||
| upstream.fmf | ||